
Every process
at Thanh Phat factories
Corrugating, printing, die-cutting and finishing all happen at Thanh Phat. With every stage in our own hands and a stable paper supply, standard production takes just 3–7 days.
- 3factories
- 34,000m² floor space
- 200employees
- 3–7days to produce
Factory floor
From paper roll to finished carton
Paper rolls are corrugated into 3, 5 and 7-ply board, which moves straight on to printing, die-cutting, stitching, gluing and bundling on the same floor.
- Factory 1 · Hamlet 5, Phu Cat Commune, Hanoi, Vietnam14,000 m²
- Factory 2 · Ha Hamlet, Phu Dong Commune, Hanoi, Vietnam10,000 m²
- Factory 3 · Ha Hamlet, Phu Dong Commune, Hanoi, Vietnam10,000 m²


Production process
9 steps, from order intake to customer care
Production plans are sent automatically by software to each machine. Every product and material is coded, so the process is managed accurately and efficiently.

A closed-loop process
- Office
- Production
- Logistics
01Sales Department
Order intake
Confirm specification, quantity and delivery date.
02Planning Department
Production planning
Balance materials and machine capacity.
03Corrugator
Corrugating
Receives the plan automatically and makes corrugated board.
04Printing presses
Printing
Flexo, Process, Offset, digital.
05Automatic die-cutter
Die-cutting
Cutting, creasing and shaping with a die.
06Stitchers · Gluers
Finishing
Stitched or glued, packed to specification.
07Finished-goods warehouse
Warehousing
Stored by code, ready to ship.
08Logistics
Delivery
Delivered to your door, on time, in full.
09Sales Department
Customer care
Feedback and after-sales support.
Managed by codeEvery product and material is coded and tracked through the process – efficient and accurate.
See each step in detail
- 01Sales team reviewing an order with a customer
anh-goc/tiep-nhan-don.jpgOrder intake
The Sales Department receives your request and agrees with you on the carton specification, flute type, print artwork and quantity. The order is then scheduled for production.
- 02

Material preparation
Paper rolls are selected to suit each order, and starch adhesive is mixed to the correct formula. Incoming paper is inspected before it goes into production.
- 03

Corrugating
Paper runs through corrugating rolls to form the flutes, then is bonded with liners into 3, 5 or 7-ply board. The board is scored, slit and cut to length, then stacked and moved on to the next stage.
- 04

Printing
Your product and brand information is printed onto the cartons according to the approved artwork. The press is set up and a test sample is run and checked before the full print run.
- 05

Die-cutting
Board is die-cut to form box shapes, locking tabs and vent holes according to the drawing. This stage is used for die-cut boxes, trays and other custom shapes.
- 06

Finishing: stitching, gluing
Cartons are stitched or glued into finished products to your specification. Every product gets a final check before packing.
- 07

Packing and storage
Finished goods are bundled, counted and stored by order. They are kept in their assigned place, away from moisture, ready for delivery.
- 08

Delivery
Goods are dispatched and delivered straight to your warehouse on the agreed schedule.
- 09

Customer care
After delivery, our Customer Service team follows up on your feedback and suggestions. Repeat orders keep the approved specification, so reordering is faster.
Machinery and equipment
A line equipped for every stage
Click a photo to enlarge it.

Corrugating line

Flexo press

Process press

Offset press

Digital press

Die-cutter

Carton stitcher

Automatic folder-gluer

Slotter / slitter

Paper roll clamp truck
Quality control
IQC – PQC – OQC: three inspection stages
The results of every step are reported and kept on file. Our management system is certified to ISO 9001 and ISO 14001.
- IQC
Incoming material control
Incoming materials are inspected against quality standards before they enter the warehouse. Accepted materials are stocked; rejected materials are returned to the supplier with a report.
- PQC
In-process quality control
Products are inspected at every stage according to the production plan. When nonconforming goods are found, the line stops to correct the problem and remove defects; only conforming goods move on to the next stage.
- OQC
Outgoing quality control
Finished goods get a final inspection before storage and delivery to the customer. The results of every step are reported and kept on file.






Laboratory equipment
- Bursting strength tester
- Ring crush / edge crush tester (RCT/ECT)
- Box compression tester (BCT)
- Sample cutters
- Electronic balance
Certifications & quality records
Certificates and test results
Click a certificate to view it full size. Test reports are issued by independent laboratories and open as the original PDF.

ISO 9001:2015
Quality management system
- Certificate no.
- QMS/015609/0124
- Issued by
- Quality Control Certification (QCC)
- Valid
- 10/01/2024 – 09/01/2027

ISO 14001:2015
Environmental management system
- Certificate no.
- EMS/015611/0124
- Issued by
- Quality Control Certification (QCC)
- Valid
- 11/01/2024 – 10/01/2027

FSC™ Chain-of-Custody
FSC chain of custody for paper products
- Certificate no.
- SGSHK-COC-370774
- Issued by
- SGS Hong Kong Limited
- Valid
- 26/07/2025 – 27/05/2029
Need cartons for your next order?
Send us your specification and quantity, and our Sales Department will reply with a quote within 24 working hours. Free samples, ready in 3 days.